See All Projects

Turning Vision Into a Reality

Evergreen Avenue

  • Effingham
  • Inspection
  • Material Testing
  • Street

Phase 1 of Evergreen Avenue consists of a 6,946-foot extension of Evergreen West of Effingham. Milano & Grunloh Engineers furnished the environmental report, preliminary engineering study, and Right-of-Way on Evergreen West, along with material testing, staking, and construction inspection on parts of the road.