Turning Vision Into a Reality
Lake Sara Water Cooperative, Inc.
Growth of the Lake Sara area demanded that a new 400,000-gallon water tower replace the existing 40,000-gallon tank. Construction of the tower began in December of 1997 and was completed in December of 1998, at a cost of $500,000. This tower now serves over 1,000 rural customers in eight square miles in Effingham County. Milano & Grunloh provided the design, permitting, construction guidance, resident engineering, and inspection for this project.